docs(rewrite): status update

This commit is contained in:
ddidderr committed 2026-10-12 10:54:15 +02:00
1 parent daf5080453
commit 1327e63811
1 file changed
+3 -1
+3 -1
View File
@@ -73,7 +73,8 @@ Legend: ⬜ todo · 🟨 in progress · ✅ done (gate passed, committed) · ⚠
| RV6 | final Codex verification + sweep + verdict | codex astra | ✅ | 22/23 resolved; 7 small gap groups → Z8 | | RV6 | final Codex verification + sweep + verdict | codex astra | ✅ | 22/23 resolved; 7 small gap groups → Z8 |
| Z8 | RV6 gaps: crash abort handoff, SHELL/PATH bytes, Windows env, show-config round-trip, lib locale | sonnet | ✅ | 3390 tests | | Z8 | RV6 gaps: crash abort handoff, SHELL/PATH bytes, Windows env, show-config round-trip, lib locale | sonnet | ✅ | 3390 tests |
| RV7 | final Codex verification of RV6 rows + sweep + verdict | codex astra | ✅ | all prior rows resolved; 9 narrow byte/Windows gaps → Z9 | | RV7 | final Codex verification of RV6 rows + sweep + verdict | codex astra | ✅ | all prior rows resolved; 9 narrow byte/Windows gaps → Z9 |
| Z9 | RV7 gaps + systematic config-string consumer audit | sonnet | 🟨 | | | Z9 | RV7 gaps + systematic config-string consumer audit | sonnet | ✅ | 3405 tests; flaky TMPDIR test race fixed |
| Z10 | byte-typed C API key/preedit text | sonnet | 🟨 | |
## Log ## Log
- 2026-10-11: Phase 0 complete; Phase 1 launched. - 2026-10-11: Phase 0 complete; Phase 1 launched.
@@ -103,3 +104,4 @@ Legend: ⬜ todo · 🟨 in progress · ✅ done (gate passed, committed) · ⚠
- 2026-10-12: Z6 committed (3348 tests). RV5 found remaining byte-path leaks + 2 regressions → Z7 (structural fix). - 2026-10-12: Z6 committed (3348 tests). RV5 found remaining byte-path leaks + 2 regressions → Z7 (structural fix).
- 2026-10-12: Z7 committed (EncodedOs newtype; 3376 tests). RV6 final verification running. - 2026-10-12: Z7 committed (EncodedOs newtype; 3376 tests). RV6 final verification running.
- 2026-10-12: Z8 committed (3390 tests, cross-checks green). RV7 running. - 2026-10-12: Z8 committed (3390 tests, cross-checks green). RV7 running.
- 2026-10-12: Z9 committed (audit table in notes/final-Z9.md). Z10 launched; RV8 after.